 |  | 7/10/2003 | Ordered preview plans |
 |  | 7/20/2003 | Clean out the garage and Build some benches |
 |  | 8/12/2003 | Kit arrived at the office |
 |  | 9/2/2003 | Horizontal Stab Rear Spar |
 |  | 9/5/2003 | Cleco & Drill rear spar |
 |  | 9/6/2003 | Cut tapers on front angles 710 & 714 |
 |  | 9/7/2003 | first mistake @#$%^&*&^%$# |
 |  | 9/8/2003 | Consult with vans and some engineering friends |
 |  | 9/10/2003 | Notching the ribs around the front HS Spar |
 |  | 9/16/2003 | left side HS skin |
 |  | 9/17/2003 | Prepare Hs-404& 405 |
 |  | 9/18/2003 | Drill the HS-702 |
 |  | 10/5/2003 | Deburr and mark the parts for ID |
 |  | 10/6/2003 | Dimple understructure and left side skin. |
 |  | 10/7/2003 | Alodine and Prime |
 |  | 10/8/2003 | Rivet the HS Understructure |
 |  | 10/9/2003 | Rivet HS Front Spar and structure |
 |  | 10/11/2003 | finish riveting the HS |
 |  | 10/16/2003 | Drill Deburr and Dimple the Vertical Stabilizer |
 |  | 10/17/2003 | Fly cut the lightening holes and prep |
 |  | 10/18/2003 | Alodine Prime and assemble Vertical Stab Spar |
 |  | 10/20/2003 | Finishing the Vertical Stabilizer |
 |  | 10/20/2003 | Fabricate Rudder Stiffeners |
 |  | 10/26/2003 | Edge finish the stiffeners |
 |  | 10/27/2003 | Match drill Left side Rudder stiffeners |
 |  | 11/1/2003 | Dimpled the rudder left side |
 |  | 11/2/2003 | Alodine and prime stiffeners |
 |  | 11/3/2003 | Back Riveted The L/S rudder Skin |
 |  | 11/8/2003 | inspection of left side rudder |
 |  | 11/9/2003 | Right side rudder skin stiffeners. |
 |  | 11/11/2003 | Rivet right side Rudder Skin |
 |  | 11/15/2003 | Building the rudder skeleton |
 |  | 11/16/2003 | Really big rudder day |
 |  | 11/19/2003 | Wing Jigs |
 |  | 11/19/2003 | Countersink the Rudder trailing edge wedge |
 |  | 11/23/2003 | Alodine, Prime and Assemble the rudder Skeleton |
 |  | 11/28/2003 | Closing the Rudder and riveting the skins |
 |  | 11/28/2003 | Back rivet the stiffeners & doubler |
 |  | 11/29/2003 | Riveting the rudder trailing edge |
 |  | 12/26/2003 | Preparing the Rudder Skin Stiffeners |
 |  | 12/27/2003 | Deburr, Dimple, Alodine and Prime |
 |  | 12/29/2003 | EAA Tech Visit |
 |  | 1/1/2004 | Major Elevator Progress Today |
 |  | 1/3/2004 | Disassemble. Deburr |
 |  | 1/4/2004 | Riveting the right elevator |
 |  | 1/5/2004 | Finish riveting the right elevator |
 |  | 2/7/2004 | Freebee Steel wing jig |
 |  | 2/15/2004 | Status report and Fiberglass Tips |
 |  | 2/16/2004 | Horizontal Stabilizer fiberglass tips |
 |  | 2/16/2004 | Fiberglass Tips Continued |
 |  | 2/20/2004 | Trimming the H/S fiberglass tips. |
 |  | 2/21/2004 | Glassing & attaching Fiberglass tips |
 |  | 2/22/2004 | Glassing and fairing the tips |
 |  | 2/25/2004 | Lengthen the jig to 114" |
 |  | 2/25/2004 | Fairing fiberglass tips with lightweight filler |
 |  | 2/26/2004 | More fairing of Fiberglass tips |
 |  | 3/2/2004 | More fairing on the Elevator tips |
 |  | 3/5/2004 | Finished fiberglass on left & right elevators tips |
 |  | 3/6/2004 | Working on the fiberglass tips |
 |  | 3/7/2004 | Vertical Stabilizer Fiberglass tip work |
 |  | 3/9/2004 | Fiberglass tip work |
 |  | 3/12/2004 | Reorganize rivet storage |
 |  | 3/13/2004 | Installing Rudder Tip. |
 |  | 3/14/2004 | Rudder Tip fairing |
 |  | 3/17/2004 | Glassing the Rudder tip cont… |
 |  | 3/20/2004 | Rudder tip Cont. |
 |  | 3/21/2004 | Rudder fiberglass tip |
 |  | 3/23/2004 | Finishing the rudder tip |
 |  | 3/24/2004 | Fairing the fiberglass tip |
 |  | 3/27/2004 | Finished with VS Tip! |
 |  | 3/28/2004 | Accident Almost! |
 |  | 4/5/2004 | Wings ship this week |
 |  | 4/8/2004 | Wings arrive tomorrow!!! |
 |  | 4/9/2004 | Wing Kit arrives |
 |  | 4/10/2004 | Wings, unpacking and inventorying |
 |  | 4/11/2004 | Ready to start on spar countersinking |
 |  | 4/12/2004 | Spar |
 |  | 4/13/2004 | Started installing platenuts on right spar |
 |  | 4/14/2004 | Finished Tank platenuts on right spar |
 |  | 4/16/2004 | Finished Tank platenuts on left spar |
 |  | 4/17/2004 | Inspection platenute both spars & more… |
 |  | 4/18/2004 | Fabricate and install Tie Down Brackets on Spar. |
 |  | 4/19/2004 | Left wing Rear Spar Prep |
 |  | 4/21/2004 | Left wing rear spar |
 |  | 4/22/2004 | Rib deburring and edge prep |
 |  | 4/23/2004 | Fluting and straitening ribs |
 |  | 4/24/2004 | primed and assembled rear spar and test fit ribs |
 |  | 4/24/2004 | Fluting left wing main ribs |
 |  | 4/25/2004 | Prep. Alodine, Prime & Assemble Wing Skeleton |
 |  | 4/26/2004 | Brackets and braces |
 |  | 4/27/2004 | Riveted Main Ribs to spar |
 |  | 4/28/2004 | Jigged the wing and started skinning |
 |  | 4/29/2004 | Skinning left wing continued |
 |  | 4/30/2004 | Drilling Left wing skins Continued. |
 |  | 5/1/2004 | Left wing leading edge skin |
 |  | 5/2/2004 | Tank to leading edge strip and "Z" brackets |
 |  | 5/3/2004 | Fabricate tank "Z" brackets |
 |  | 5/5/2004 | "Z" Brackets Continued |
 |  | 5/6/2004 | Redoing the fuel Tank Brackets. |
 |  | 5/7/2004 | Left wing "Z" brackets continued |
 |  | 5/9/2004 | Build Dimpling Table |
 |  | 5/10/2004 | Tank Stiffeners and fuel Trap door for left wing |
 |  | 5/15/2004 | Checking out the RV's |
 |  | 5/16/2004 | Drilling the Gas cap and fuel tank rib prep |
 |  | 5/18/2004 | Gas Caps and capacitance Senders |
 |  | 5/19/2004 | First flight in a RV-7 200HP C/S prop "N714D" |
 |  | 5/20/2004 | Left Wing Fuel Tank |
 |  | 5/22/2004 | More Left Fuel Tank |
 |  | 5/25/2004 | Left Fuel Access Plate |
 |  | 5/26/2004 | Fuel Tank Prep |
 |  | 5/28/2004 | Prosealed Tank Stiffeners, drain and the gas cap |
 |  | 5/29/2004 | Priming Day at Walter Tondu's |
 |  | 5/31/2004 | Riveted the Left Leading edge and more |
 |  | 6/1/2004 | Left Leading edge skin work |
 |  | 6/2/2004 | Riveted Leading Edge left wing |
 |  | 6/3/2004 | Skin work and rib dimpling |
 |  | 6/5/2004 | Dimpled outboard skin & more |
 |  | 6/6/2004 | Fuel Tanks and leading edge work |
 |  | 6/7/2004 | Riveted left L.E. Ribs to Spar |
 |  | 6/8/2004 | Fit wing skins and dimpled understructure |
 |  | 6/9/2004 | Deburr, Dimple, & more |
 |  | 6/14/2004 | More wing skin work |
 |  | 6/15/2004 | Trim Skin for landing light |
 |  | 6/16/2004 | left landing light cutout |
 |  | 6/17/2004 | Left Wing Landing Light |
 |  | 6/20/2004 | Prepping for Proseal |
 |  | 6/21/2004 | EAA Tech inspection and Trip to the New Spaceport! |
 |  | 6/23/2004 | Drill and cleco the F-719 skin stiffeners |
 |  | 6/25/2004 | Proseal At Last! |
 |  | 6/27/2004 | Left Tank almost done |
 |  | 6/30/2004 | Tank Plumbing & Senders |
 |  | 7/2/2004 | Left tank plumbing and wiring |
 |  | 7/3/2004 | Finished Left Fuel Tank |
 |  | 7/5/2004 | Riveted inboard top skin, worried about sealant! |
 |  | 7/7/2004 | Skin doubler plate for Pitot Tube |
 |  | 7/12/2004 | Rivet top skins |
 |  | 7/13/2004 | wing interior work |
 |  | 7/14/2004 | More Skin riveting! |
 |  | 7/17/2004 | Pitot tube cutout |
 |  | 7/19/2004 | Attach Aileron brace to rear spar |
 |  | 7/21/2004 | Install Aileron Gap fairing Left wing |
 |  | 7/23/2004 | Rear spar flap brace |
 |  | 7/24/2004 | TC inspection |
 |  | 7/25/2004 | Checking one small detail |
 |  | 7/26/2004 | working on flap brace |
 |  | 7/27/2004 | Aileron Bellcrank and Push tubes |
 |  | 7/28/2004 | Fluted the right wing ribs |
 |  | 7/31/2004 | Pushrods and shop reorganization |
 |  | 8/1/2004 | Installed Pushrods and dimpled skins |
 |  | 8/2/2004 | riveting bottom skin |
 |  | 8/4/2004 | Riveted the inboard skin to the inboard three ribs |
 |  | 8/8/2004 | Riveting bottom skin |
 |  | 8/9/2004 | more riveting |
 |  | 8/10/2004 | More riveting on bottom skin |
 |  | 8/12/2004 | Left Wing Complete, started on the right wing |
 |  | 8/15/2004 | It's déjà Vu all over again on the right wing. |
 |  | 8/16/2004 | Riveted rear spar and assembled skeleton |
 |  | 8/17/2004 | Rib Prep, Alumiprep and alodine. |
 |  | 8/18/2004 | Prime Left Wing Ribs |
 |  | 8/19/2004 | Big wing day!! |
 |  | 8/20/2004 | Match drilled the top skins |
 |  | 8/21/2004 | Drilled bottom skins |
 |  | 8/22/2004 | Way Too Much Fun!!! |
 |  | 8/24/2004 | Drilled Leading edge and mounted on spar |
 |  | 8/25/2004 | Fuel Tank "Z" brackets |
 |  | 8/26/2004 | Match drilling fuel tank rear baffle to Z brackets |
 |  | 8/31/2004 | More right wing leading edge |
 |  | 9/1/2004 | Fuel Tank and leading edge |
 |  | 9/3/2004 | Access plate and nose angle |
 |  | 9/4/2004 | More tank / Nuclear Suntan Device |
 |  | 9/5/2004 | Final fuel tank prep before Proseal |
 |  | 9/6/2004 | Prosealed stiffeners |
 |  | 9/11/2004 | Prosealed and riveted gas cap flange & tank drain |
 |  | 9/12/2004 | More prosealing right tank |
 |  | 9/17/2004 | More Proseal on right tank |
 |  | 9/18/2004 | Mugu Air show and Proseal Fuel Tank |
 |  | 9/19/2004 | Fuel tank plumbing and Baffle work |
 |  | 9/21/2004 | Counter sink spars for leading edge |
 |  | 9/22/2004 | Prime Leading edge ribs and Z brackets |
 |  | 9/23/2004 | Dimpled the leading edge ribs |
 |  | 9/24/2004 | Riveted the leading edge together |
 |  | 9/26/2004 | Prosealed fuel tank and more |
 |  | 9/28/2004 | Finished the damn fuel tanks |
 |  | 9/29/2004 | Removed vinyl and deburred the outboard skin |
 |  | 10/1/2004 | Top skins are completely riveted |
 |  | 10/2/2004 | Leak tested right wing tank |
 |  | 10/3/2004 | Mounted right fuel tank, wing on dolly |
 |  | 10/4/2004 | Aileron Brackets and Gap Seal |
 |  | 10/7/2004 | Sorry Folks, On Vacation |
 |  | 10/19/2004 | Aileron and flap attachments Right Wing. |
 |  | 10/20/2004 | More rear spar work |
 |  | 10/21/2004 | Fabricated aileron stiffeners |
 |  | 10/22/2004 | More Aileron Stiffener work |
 |  | 10/23/2004 | Dimpled aileron stiffeners and skins |
 |  | 10/24/2004 | Riveted aileron stiffeners and PARTY!!! |
 |  | 10/25/2004 | More Aileron Work |
 |  | 10/26/2004 | More aileron prep work |
 |  | 10/27/2004 | Dimpled the aileron skeletons |
 |  | 10/29/2004 | Alodined and dimpled |
 |  | 10/30/2004 | More aileron prep, Primed skeleton |
 |  | 11/1/2004 | Aileron Doublers |
 |  | 11/2/2004 | Lunchtime Supply Run to AC and flying with Dan C. |
 |  | 11/3/2004 | Riveted the ailerons |
 |  | 11/4/2004 | Right Aileron Completed |
 |  | 11/5/2004 | Ailerons complete, starting Flaps |
 |  | 11/6/2004 | Fabricated flap brace FL-706A |
 |  | 11/7/2004 | Deburr, alumiprep, alodine and prime |
 |  | 11/9/2004 | Almost ready to rivet flaps |
 |  | 11/11/2004 | Riveting Left Flap |
 |  | 11/12/2004 | Left Flap Completed! |
 |  | 11/13/2004 | Right flap ready to rivet |
 |  | 11/14/2004 | Completed right flap |
 |  | 11/15/2004 | Right wing bottom skin prep |
 |  | 11/16/2004 | flap brace and bottom skins |
 |  | 11/17/2004 | Dimpling and prepping for skinning |
 |  | 11/18/2004 | Bottom skins dimpled! |
 |  | 11/19/2004 | Installed the conduit and vacuumed |
 |  | 11/20/2004 | Riveting Bottom skins |
 |  | 11/21/2004 | Finished riveting the bottom skins |
 |  | 11/22/2004 | Mounting flaps |
 |  | 11/23/2004 | Drilled right flap hinge and mounted |
 |  | 11/25/2004 | Flap hinge prep |
 |  | 11/26/2004 | flaps complete! |
 |  | 11/27/2004 | Wings Finished! |
 |  | 11/30/2004 | Fine Living Television show |
 |  | 12/3/2004 | Fuselage picked up at FedEx |
 |  | 12/4/2004 | UNPACKING THE CRATE |
 |  | 12/5/2004 | More Unpacking |
 |  | 12/6/2004 | more unpacking |
 |  | 12/9/2004 | Fluting bulkheads and fabbing firewall angles |
 |  | 12/15/2004 | Fitting and match drilling Stiffeners |
 |  | 12/17/2004 | firewall and hardware bags |
 |  | 12/18/2004 | Prepped firewall for Assembly |
 |  | 12/22/2004 | Riveted the firewall |
 |  | 12/28/2004 | Drilling the F704 Bulkhead |
 |  | 12/29/2004 | F-704 control mounting bracket fabrication |
 |  | 12/31/2004 | Control sticks on F-704 bulkhead |
 |  | 1/2/2005 | More 704 bulkhead |
 |  | 1/4/2005 | Riveted sides to aft F-704 Bulkhead |
 |  | 1/9/2005 | finished 7F-704, Started F-705 |
 |  | 1/16/2005 | F-705 Bulkhead assembly |
 |  | 1/17/2005 | More F-705 Bulkhead |
 |  | 1/22/2005 | More F-705 Bulkhead |
 |  | 1/30/2005 | Major Priming Day |
 |  | 2/6/2005 | Moved wings to hangar, more bulkhead work |
 |  | 2/7/2005 | F-705 Bulkhead |
 |  | 2/12/2005 | 706 bulkhead and bellcrank support structure |
 |  | 2/13/2005 | More bulkhead prep, 711 & 712 |
 |  | 2/18/2005 | More rear bulkheads, DAAP |
 |  | 2/19/2005 | EAA 96Chapter meeting and Rear Bulkheads |
 |  | 2/20/2005 | Finished Bulkheads and fitted Tail wheel Weldment. |
 |  | 2/21/2005 | Finally, working on skins |
 |  | 2/22/2005 | Clecoed up the Rear Fuselage |
 |  | 2/23/2005 | Tail wheel box |
 |  | 2/27/2005 | Sometimes you just gotta go fly |
 |  | 3/6/2005 | 711 and 712 bulkheads reflange and BFR |
 |  | 3/13/2005 | Aft bottom skin and "J" channels |
 |  | 3/14/2005 | More match drilling on J channels |
 |  | 3/18/2005 | Drilled lower "J" channels |
 |  | 3/26/2005 | Flipped Fuselage and matchdrilled remaining holes |
 |  | 3/27/2005 | Countersinking and riveting the bottom tail skin |
 |  | 3/31/2005 | Remove protective Plastic and Deburr Skins |
 |  | 4/2/2005 | Deburring and Dimpling |
 |  | 4/3/2005 | Riveting again at last! |
 |  | 4/5/2005 | More riveting on the Tail cone |
 |  | 4/6/2005 | More riveting on tail cone |
 |  | 4/7/2005 | Little bit of riveting |
 |  | 4/9/2005 | More riveting and fabrication of rudder stops |
 |  | 4/24/2005 | Moved entire project to the Torrance Airport! |
 |  | 4/26/2005 | Setting up to build at TOA hangar |
 |  | 4/29/2005 | Fabricated Spacers and Modified Center seat ribs |
 |  | 4/30/2005 | Clecoed the center section together |
 |  | 5/2/2005 | More match drilling |
 |  | 5/3/2005 | Center section and Tech counselor visit. |
 |  | 5/8/2005 | Drilled seat pan skins and fabricated tunnel cover |
 |  | 5/10/2005 | Prepping Center section |
 |  | 5/19/2005 | Prepped & primed, Center fuse ready for riveting |
 |  | 5/22/2005 | Riveted Seat and Baggage floor ribs, moved wings |
 |  | 5/24/2005 | Riveted Seat Ribs |
 |  | 5/27/2005 | Joined rear and center section |
 |  | 6/8/2005 | Baggage ribs and Conical bend |
 |  | 6/17/2005 | Drilling Longerons and more |
 |  | 6/18/2005 | More longeron drilling |
 |  | 6/19/2005 | Drilling skins. Hung the firewall |
 |  | 6/21/2005 | Drilled and Clecoed the firewall |
 |  | 6/22/2005 | Aux Longerons and clips |
 |  | 6/24/2005 | Fabricated and installed the lower Longeron F-717 |
 |  | 7/2/2005 | Fabricating and installing gussets |
 |  | 7/6/2005 | Fabricate F-796 Bracket and spacers |
 |  | 7/10/2005 | Fabricated brakes pedals |
 |  | 7/12/2005 | Brakes and rudder pedals |
 |  | 7/15/2005 | Firewall gussets |
 |  | 7/16/2005 | Fitting rudder and brake assembly to fuselage. |
 |  | 7/22/2005 | Rudder Brace and Technical Visit |
 |  | 7/30/2005 | Suddenly single and other stuff |
 |  | 7/31/2005 | Final match drilling of forward fuselage |
 |  | 8/7/2005 | Disassembly and prep |
 |  | 8/19/2005 | Disassembly for prep |
 |  | 8/20/2005 | Dimpled the forward bottom skin |
 |  | 8/21/2005 | Walter flies again |
 |  | 8/27/2005 | More Dimpling and prep. |
 |  | 8/30/2005 | Countersinking the Longerons and more prep |
 |  | 9/4/2005 | Almost ready to reassemble fuselage for riveting |
 |  | 9/13/2005 | Fuselage assembly |
 |  | 9/17/2005 | Assembly and riveting. |
 |  | 9/18/2005 | Riveting at last |
 |  | 9/19/2005 | More Fuselage Riveting |
 |  | 9/20/2005 | More forward Fuselage riveting |
 |  | 9/22/2005 | Floor Stiffeners and firewall to longeron bolts |
 |  | 9/25/2005 | TIPPED THE CANOE TODAY!!! |
 |  | 10/1/2005 | Forward & Aft Canopy deck,. |
 |  | 10/2/2005 | Installing the F-695 Gussets and panel planning |
 |  | 10/13/2005 | Dan Checkoway makes another technical visit. |
 |  | 10/15/2005 | drilling the Aft Deck! |
 |  | 10/21/2005 | Riveted Aft Deck and More |
 |  | 10/22/2005 | left canopy rail and canopy gussets |
 |  | 11/25/2005 | Back from China pounding rivets again |
 |  | 12/8/2005 | Cleco on aft fuselage Turtle deck skins |
 |  | 12/10/2005 | F-688 gusset, canopy decks and F-757 tip up plate |
 |  | 12/16/2005 | more work on the turtle deck |
 |  | 12/18/2005 | Bulkhead gussets and shoulder harness tie downs |
 |  | 12/25/2005 | Baggage area , priming & planning the move. |
 |  | 1/3/2006 | Moved the project |
 |  | 1/9/2006 | Baggage compartment sides and floors |
 |  | 1/15/2006 | modified seat ribs for control sticks |
 |  | 1/18/2006 | Drilled holes for electrical bushings |
 |  | 1/22/2006 | Conduits and baggage area |
 |  | 1/30/2006 | Primed Seat Pans |
 |  | 2/1/2006 | Cockpit Seats |
 |  | 2/4/2006 | Seat Pans |
 |  | 2/10/2006 | Drilled and fitted cockpit forward tunnel cover |
 |  | 2/13/2006 | Cockpit Trim covers |
 |  | 2/14/2006 | Flap motor assembly and fuel pump base |
 |  | 2/18/2006 | Fuel pump Indexing |
 |  | 2/20/2006 | Fuel Valve plate |
 |  | 2/25/2006 | Fuel Valve cover and priming |
 |  | 2/26/2006 | Fuel pump complete, on to flap motor. |
 |  | 2/27/2006 | Flap actuator and motor |
 |  | 3/4/2006 | Mated Wings and set incidence and sweep |
 |  | 3/5/2006 | Made second landing light cutout |
 |  | 4/1/2006 | Finish kit Arrives! |
 |  | 4/3/2006 | Built storage loft for finish kit components |
 |  | 4/8/2006 | Fuel Valve and Fuel lines |
 |  | 4/28/2006 | Preparing to Attach horizontal Stabilizer |
 |  | 4/29/2006 | Attached the Horizontal Stab to the Fuselage |
 |  | 4/30/2006 | Prepping to attach Vertical Stabilizer |
 |  | 5/2/2006 | attaching Vertical Stabilizer |
 |  | 5/21/2006 | Empennage mounted for good |
 |  | 5/22/2006 | Mounted the Engine mount |
 |  | 6/3/2006 | Plane is on the Landing Gear! |
 |  | 6/5/2006 | Fabricated three Pushrods |
 |  | 6/7/2006 | Rigging the control system |
 |  | 6/8/2006 | Trimming and rigging the flaps & peeling plastic. |
 |  | 6/10/2006 | Rigging Flap pushrods |
 |  | 10/2/2006 | Fabricate Tank Vents |
 |  | 10/6/2006 | Fabricated the Battery Box |
 |  | 10/8/2006 | Fabricated Right wing Fuel and breather lines |
 |  | 10/9/2006 | Left Wing Fuel and vent lines |
 |  | 10/11/2006 | Installed Rudder Steering Link |
 |  | 10/14/2006 | Attached both wing tips |
 |  | 10/15/2006 | Baggage compartment bulkhead |
 |  | 11/10/2006 | Painting the Cockpit |
 |  | 12/3/2006 | Master contactors and backing plate |
 |  | 12/5/2006 | Installed the static ports and lines |
 |  | 12/6/2006 | Installed Spar Caps & paint prep |
 |  | 12/7/2006 | Installed Naca Ducts |
 |  | 12/8/2006 | Painted the Cockpit |
 |  | 12/10/2006 | Plumbed the brake pedals |
 |  | 12/11/2006 | Installing Fuel vent lines |
 |  | 12/12/2006 | Brakes and sub panel |
 |  | 12/15/2006 | Instrument Sub panel |
 |  | 12/17/2006 | Fabricating the Cabin frame roll bar |
 |  | 12/23/2006 | The airplane has numbers |
 |  | 12/31/2006 | Fabricating the F-631 cabin frame "ROLL BAR" |
 |  | 1/1/2007 | More fabricating the F-631 cabin frame "ROLL BAR" |
 |  | 1/3/2007 | More Cabin Frame Fabrication |
 |  | 1/6/2007 | More Cabin Frame |
 |  | 1/13/2007 | Riveting the Cabin Frame |
 |  | 1/14/2007 | Cabin frame riveted |
 |  | 1/15/2007 | More cabin frame |
 |  | 1/16/2007 | Tip up modification to cabin frame connection |
 |  | 1/20/2007 | Cabin Frame mounting |
 |  | 1/21/2007 | Riveting the Channel to the Cabin Frame |
 |  | 1/23/2007 | Painted cabin frame |
 |  | 1/24/2007 | Installed Cabin frame |
 |  | 1/27/2007 | Making the instrument panel |
 |  | 1/28/2007 | Cutting the panel part 2 |
 |  | 2/2/2007 | Fitting avionics in the instrument panel |
 |  | 2/4/2007 | Mounted the magnetometer |
 |  | 2/8/2007 | Riveted the sub panel, installed the clock |
 |  | 2/9/2007 | Made AHARS Tray |
 |  | 2/14/2007 | wiring on the sub panel |
 |  | 2/15/2007 | Installed power buss and ELT |
 |  | 2/19/2007 | More wiring |
 |  | 2/20/2007 | Control Stick wiring, brakes and Instruments |
 |  | 2/23/2007 | Installed Com Antenna |
 |  | 2/24/2007 | Installed other antenna and more |
 |  | 3/11/2007 | Fuel line, fuel purge and Manifold Pressure |
 |  | 3/12/2007 | Control stick and sensor wiring. |
 |  | 4/1/2007 | Installed the manifold pressure sensor fitting |
 |  | 4/4/2007 | Connected Elevator trim tab servo |
 |  | 4/5/2007 | More electrical wiring. |
 |  | 4/6/2007 | Installed and powered the flap & starter switches |
 |  | 4/7/2007 | Installed ELT push to test switch |
 |  | 4/10/2007 | Installed Aileron Trim assembly kit |
 |  | 4/16/2007 | Worked on the bearing blocks |
 |  | 4/19/2007 | Riveting aft turtledeck skin |
 |  | 4/20/2007 | Riveted the aft turtledeck skin |
 |  | 4/23/2007 | Installed Canopy Hinge Bearing Blocks |
 |  | 4/30/2007 | Canopy latch Mechanism |
 |  | 5/3/2007 | Tidying up details |
 |  | 5/6/2007 | Canopy Latch Linkage |
 |  | 5/12/2007 | Wiring |
 |  | 6/6/2007 | Landing lights and Wig-Wag |
 |  | 6/8/2007 | Wiring trim indicators to EFIS |
 |  | 6/12/2007 | Cockpit vents, EIS programming, and tip plexi |
 |  | 6/20/2007 | Finished right wing tip |
 |  | 6/22/2007 | Nutplates on the left wing tip |
 |  | 6/24/2007 | Removed wings and firewall work |
 |  | 6/25/2007 | Install hinge on the left side of the firewall |
 |  | 6/26/2007 | More cowl hinges |
 |  | 6/27/2007 | Installed Aileron Trim Servo |
 |  | 6/28/2007 | Aileron Trim Servo and stick wiring |
 |  | 6/29/2007 | Connected trims to EFIS indicator |
 |  | 6/30/2007 | Running wing wiring and comm coax |
 |  | 7/6/2007 | More wiring and a little paint |
 |  | 7/7/2007 | Empennage fairing |
 |  | 7/8/2007 | More empennage fairing |
 |  | 7/13/2007 | |